From: 441 Coelho St, Milpitas, CA 95035 To: 441 Coelho St, Milpitas, CA 95035
Driving Distance: 7687.6 miles Time: 13 days, 4 hours, 36 minutes


Time Distance Instruction
DAY 1
12:00 PM0.0 1   Depart Milpitas, CA
12:06 PM1.7Merge onto I-680 [Sinclair Fwy] (North) for 61.7 mi
Interchange Reconstruction in Pleasanton (NB) from 05/30/2001 to 11/01/2002
1:09 PM63.3Turn off onto Ramp for 0.5 mi towards I-80 / Sacramento
1:09 PM63.8Merge onto I-80 (North-East) for 14.7 mi
1:24 PM78.6Turn off onto Ramp for 0.8 mi towards I-505 / Winters / Redding
1:25 PM79.3Merge onto I-505 (North) for 32.7 mi
1:53 PM112.0At I-5 I-5 Exit, turn off onto Ramp for 0.3 mi
1:54 PM112.4Merge onto I-5 (North-West) for 68.3 mi
2:53 PM180.6At I-5 CR-7 Exit, turn off onto Ramp for 0.1 mi
2:53 PM180.8Turn RIGHT (East) onto CR-7 for 0.3 mi
2:54 PM181.1Turn RIGHT (South) onto CR-99W [Cnty Rd 99] for 1.0 mi
2:56 PM182.1Turn LEFT (East) onto CR-9 [Wyo Ave] for 5.9 mi
3:07 PM188.0Turn LEFT (North) onto Road T [4th Ave] for 1.6 mi
3:10 PM189.6Turn RIGHT (East) onto Cutler Ave [Road 4] for 1.8 mi
3:14 PM191.4Bear LEFT (East) onto Road 205 for 0.5 mi
3:15 PM191.8Turn LEFT (North-East) onto CR-204 [Montgomery Ave] for 0.1 mi
3:16 PM192.0Turn RIGHT (South) onto CR-203 [Canal Rd] for 3.2 mi
3:22 PM195.1Turn LEFT (East) onto SR-32 [E Walker St] for 7.5 mi
3:37 PM202.7Turn LEFT (North) onto W East Ave for 1.6 mi
3:41 PM204.2Turn LEFT (North-West) onto Esplanade for 0.4 mi
3:43 PM204.8 2   Arrive Chico, CA
End of day
DAY 2
9:00 AM204.8Depart Chico, CA
9:01 AM205.1Turn LEFT (South-East) onto Esplanade for 0.4 mi
9:02 AM205.4Turn LEFT (North-East) onto East Ave for 0.4 mi
9:03 AM205.9Turn LEFT (North-West) onto Ramp for 0.2 mi
9:03 AM206.0Merge onto SR-99 (North-West) for 3.1 mi
9:07 AM209.1At SR-99 Esplanade Exit, turn off onto Ramp for 120 yds
9:08 AM209.2Merge onto SR-99 (North-West) for 32.5 mi
9:24 AM224.1Refuel before here (last refuel was 224.1 miles ago)
9:43 AM241.7Continue (West) on SR-36 [SR-99] for 2.0 mi
9:46 AM243.7Turn off onto Ramp for 0.2 mi
9:46 AM244.0Merge onto I-5 (North) for 220.0 mi
Construction near Dirigo from 02/08/2002 to 08/30/2002
11:57 AM392.5Entering Oregon
12:51 PM453.5Refuel before here (last refuel was 229.4 miles ago)
1:00 PM464.0Rest break (15 mins)
1:15 PM464.0At I-5 Exit 71, stay on I-5 [SR-99] (North) for 217.1 mi
Construction in south Myrtle Creek from 07/06/2001 to 08/02/2002
4:23 PM681.0Turn off onto Ramp for 0.8 mi towards I-205 / I-84 / The Dalles / Seattle
4:24 PM681.8Merge onto I-205 [East Portland Fwy] (East) for 21.2 mi
4:25 PM682.3Refuel before here (last refuel was 228.8 miles ago)
4:42 PM702.9Turn off onto Ramp for 0.7 mi towards I-84 / US-30 / The Dalles / Mt. Hood / Columbia River Gorge
4:43 PM703.7Merge onto I-84 [US-30] (East) for 0.7 mi
4:44 PM704.4At I-84 Exit 10, turn off onto Ramp for 0.2 mi towards 122nd Ave.
4:44 PM704.5Turn RIGHT (North) onto NE 122nd Ave for 0.2 mi
4:45 PM704.7Turn RIGHT (East) onto NE Fremont St for 0.6 mi
4:48 PM705.4 3   Arrive Portland, OR
End of day
DAY 3
9:00 AM705.4Depart Portland, OR
9:00 AM705.5Turn LEFT (West) onto NE Fremont St for 0.6 mi
9:03 AM706.1Turn RIGHT (North) onto NE 122nd Ave for 0.6 mi
9:05 AM706.7Continue (North) on NE 122nd Blvd for 0.6 mi
9:06 AM707.3Turn LEFT (West) onto NE Airport Way for 0.9 mi
9:08 AM708.2Turn RIGHT (North) onto Ramp for 0.3 mi towards I-205 / Seattle
9:08 AM708.5Merge onto I-205 [Glenn Jackson Bridge] (North) for 12.0 mi
9:10 AM710.1Entering Washington
9:19 AM720.5Turn off onto Ramp for 0.4 mi
9:19 AM720.9Merge onto I-5 (North) for 123.9 mi
Construction between Ridgefield and Woodland from 09/10/2001 to 05/03/2002
11:06 AM844.9At I-5 Exit 132, turn off onto Ramp for 1.0 mi towards So. 38 St. / WA-16 / Gig Harbor / Bremerton
11:08 AM845.9Merge onto SR-16 (North) for 26.7 mi
Bridge widening near Tacoma from 06/05/2001 to 08/30/2002
11:41 AM872.7Continue (North-East) on SR-3 for 18.0 mi
12:03 PM890.7Turn off onto Ramp for 0.3 mi towards WA-305 / Poulsbo / Bainbridge Island
12:04 PM891.0Merge onto SR-305 [SR-305 NE] (East) for 11.1 mi
12:18 PM902.1Turn RIGHT (West) onto Sportsman Club Rd NE for 1.6 mi
12:21 PM903.7Turn LEFT (South) onto Finch Rd NE for 0.2 mi
12:22 PM903.9Turn RIGHT (West) onto Wyatt Way NW for 0.1 mi
12:22 PM904.0Refuel before here (last refuel was 221.6 miles ago)
12:23 PM904.1Turn LEFT (South) onto Eagle Harbor Dr NE for 0.2 mi
12:24 PM904.2Bear RIGHT (South) onto Bucklin Hill Rd NE for 0.4 mi
12:25 PM904.6Continue (South) on Blakely Ave NE for 2.2 mi
12:29 PM906.8Turn RIGHT (South) onto NE Country Club Rd for 0.2 mi
12:30 PM907.0Turn RIGHT (South-West) onto Fort Ward Hill Rd NE for 0.8 mi
12:36 PM908.9 4   Arrive Bainbridge Island, WA
End of day
DAY 4
9:00 AM908.9Depart Bainbridge Island, WA
9:01 AM909.4Turn RIGHT (East) onto Fort Ward Hill Dr NE for 0.7 mi
9:03 AM910.0Continue (North) on Fort Ward Hill Rd NE for 0.8 mi
9:06 AM910.9Turn LEFT (North-West) onto NE Country Club Rd for 0.2 mi
9:07 AM911.1Turn LEFT (West) onto Blakely Ave NE for 2.2 mi
9:11 AM913.3Continue (North) on Bucklin Hill Rd NE for 0.4 mi
9:12 AM913.6Bear LEFT (North) onto Eagle Harbor Dr NE for 0.2 mi
9:13 AM913.8Turn RIGHT (East) onto Wyatt Way NW for 0.9 mi
9:16 AM914.7Turn RIGHT (South) onto Madison Ave N for 0.2 mi
9:17 AM914.9Turn LEFT (East) onto Winslow Way E for 0.3 mi
9:19 AM915.2Turn RIGHT (South) onto Olympic Dr SE for 0.3 mi
9:20 AM915.5*Check timetable* Take Seattle-Bainbridge Island (East)
9:55 AM915.5Take Marion St (East) for 0.3 mi
9:56 AM915.8Turn RIGHT (South) onto 2nd Ave for 0.3 mi
9:56 AM916.1Continue (South) on 2nd Ave Ext S for 0.2 mi
9:57 AM916.3Bear RIGHT (South) onto 4th Ave S for 0.3 mi
9:57 AM916.6Turn RIGHT (West) onto Ramp for 0.3 mi towards I-90 / I-5
9:58 AM916.9Merge onto I-90 (East) for 108.4 mi
11:31 AM1025.3At I-90 Exit 110, turn off onto Ramp for 0.5 mi
11:32 AM1025.8Merge onto I-82 [US-97] (South) for 142.8 mi
1:05 PM1131.9Refuel before here (last refuel was 227.9 miles ago)
1:28 PM1158.0Entering Oregon
1:37 PM1168.6At I-82 A Exit, turn off onto Ramp for 0.3 mi
1:37 PM1168.8Merge onto I-84 [Old Oregon Trail HWY-6] (East) for 22.3 mi
1:56 PM1191.1Rest break (15 mins)
2:11 PM1191.1Stay on I-84 [US-30] (East) for 219.8 mi
Resurfacing near North Powder from 07/06/2001 to 05/03/2002
4:40 PM1363.9Refuel before here (last refuel was 232.1 miles ago)
4:43 PM1367.0Entering Idaho
5:22 PM1411.0At I-84 Exit 44, turn off onto Ramp for 0.2 mi
5:22 PM1411.1Merge onto SR-55 [S Meridian Rd] (North) for 2.6 mi
5:30 PM1414.0 5   Arrive Meridian, ID
End of day
DAY 5
9:00 AM1414.0Depart Meridian, ID
9:02 AM1414.4Turn LEFT (West) onto SR-55 [Fairview Ave] for 2.6 mi
9:07 AM1416.9Turn off onto Ramp for 0.1 mi
9:08 AM1417.1Merge onto I-84 [US-30] (East) for 177.5 mi
11:40 AM1593.9Refuel before here (last refuel was 229.9 miles ago)
11:41 AM1594.6At I-84 Exit 222, turn off onto Ramp for 0.3 mi
11:41 AM1594.9Merge onto I-86 [US-30] (East) for 62.2 mi
Construction in Cotterel from 02/04/2002 to 10/11/2002
12:35 PM1657.1At I-86 Exit 63, turn off onto Ramp for 0.6 mi
12:36 PM1657.7Merge onto I-15 (North) for 35.6 mi
1:07 PM1693.3Rest break (15 mins)
1:22 PM1693.3At I-15 Exit 108, stay on I-15 [US-26] (North-East) for 209.3 mi
Construction in Spencer from 01/31/2002 to 09/27/2002
2:38 PM1781.5Entering Montana
3:15 PM1824.9Refuel before here (last refuel was 231.1 miles ago)
4:22 PM1902.6At I-15 Exit 121, turn off onto Ramp for 0.2 mi
4:22 PM1902.9Merge onto I-15 [I-90] (East) for 7.8 mi
4:29 PM1910.7At I-90 Exit 227, turn off onto Ramp for 0.4 mi
4:30 PM1911.1Merge onto I-15 (North) for 60.4 mi
5:22 PM1971.6Rest break (15 mins)
5:37 PM1971.6Stay on I-15 (North-West) for 87.9 mi
6:50 PM2057.0Refuel before here (last refuel was 232.0 miles ago)
6:52 PM2059.5At I-15 Exit 278, turn off onto Ramp for 0.4 mi
6:53 PM2059.8Continue (East) on US-89 [SR-200] for 2.9 mi
6:56 PM2062.8Turn LEFT (North) onto 15th St (S) for 1.8 mi
7:02 PM2064.5Continue (North) on US-87 [15th St N] for 109.1 mi
9:01 PM2173.6Turn RIGHT (East) onto US-2 for 33.4 mi
9:37 PM2207.0Rest break (15 mins)
9:52 PM2207.0Stay on US-2 (East) for 128.0 mi
12:14 AM2335.5 6   Arrive Glasgow
End of day
DAY 6
9:00 AM2335.5Depart Glasgow on 3rd St (North) for 0.1 mi
9:00 AM2335.6Turn LEFT (North-West) onto SR-24W [1st Ave S] for 0.4 mi
9:01 AM2335.9Turn RIGHT (East) onto US-2 [1st Ave N] for 48.9 mi
9:55 AM2384.8Turn RIGHT (South) onto SR-25 [N 4th Ave] for 5.8 mi
10:06 AM2390.7Continue (South) on SR-13 for 46.9 mi
10:57 AM2437.6Turn LEFT (East) onto SR-200 [1st Ave] for 45.6 mi
11:47 AM2483.1Turn off onto Ramp for 0.2 mi
11:47 AM2483.3Merge onto I-94 (North-East) for 85.3 mi
12:19 PM2521.3Refuel before here (last refuel was 232.3 miles ago)
12:20 PM2521.7Entering North Dakota
1:00 PM2568.6Rest break (15 mins)
1:15 PM2568.6Stay on I-94 (East) for 279.2 mi
Interchange Reconstruction near Dickerson from 05/15/2001 to 05/24/2002
3:54 PM2752.8Refuel before here (last refuel was 231.6 miles ago)
5:16 PM2847.8Rest break (15 mins)
5:31 PM2847.8Stay on I-94 [US-52] (East) for 26.4 mi
5:54 PM2873.8Entering Minnesota
5:55 PM2874.2At I-94 Exit 1, turn off onto Ramp for 0.2 mi
5:55 PM2874.4Turn RIGHT (South) onto US-75 [8th St S] for 0.6 mi
5:56 PM2875.0 7   Arrive Moorhead, MN
End of day
DAY 7
9:00 AM2875.0Depart Moorhead, MN
9:00 AM2875.6Turn RIGHT (East) onto Ramp for 0.2 mi
9:01 AM2875.8Merge onto I-94 [US-52] (East) for 223.2 mi
10:34 AM2984.0Refuel before here (last refuel was 231.1 miles ago)
12:12 PM3099.0Continue (East) on I-694 for 12.2 mi towards I-694
12:23 PM3111.2Bear LEFT (East) onto I-35E [I-694] for 0.7 mi
12:23 PM3111.9Continue (East) on I-694 for 10.9 mi towards I-694
12:33 PM3122.8Continue (South) on I-494 [I-694] for 120 yds
12:33 PM3122.8At I-494 Exit 58B, turn off onto Ramp for 0.5 mi towards I-94 / Madison
12:33 PM3123.3Merge onto I-94 [US-12] (East) for 33.7 mi
12:42 PM3133.0Entering Wisconsin
1:02 PM3157.0Rest break (15 mins)
1:17 PM3157.0At I-94 Exit 24, stay on I-94 (East) for 122.7 mi
Construction near Wilson from 02/28/2002 to 06/28/2002
2:03 PM3210.8Refuel before here (last refuel was 226.8 miles ago)
3:02 PM3279.7Bear LEFT (East) onto I-90 [I-94] for 142.0 mi
Construction between Edgerton and Madison from 01/31/2002 to 01/31/2003
5:08 PM3421.7Entering Illinois
5:08 PM3421.7*Toll road* Stay on I-90 [NW Tollway] (South) for 11.5 mi
5:17 PM3433.1Rest break (15 mins)
5:32 PM3433.1*Toll road* Stay on I-90 [Northwest Tollway] (South) for 5.9 mi
5:38 PM3439.1At I-90 Exit 76, turn off onto Ramp for 0.1 mi
5:38 PM3439.2Merge onto I-39 [US-51] (South) for 3.0 mi
5:40 PM3440.9Refuel before here (last refuel was 230.1 miles ago)
5:41 PM3442.2Turn off onto Ramp for 0.3 mi
5:42 PM3442.5Merge onto I-39 [US-51] (South-West) for 119.7 mi
7:24 PM3562.2At I-39 I-55 Exit, turn off onto Ramp for 0.3 mi
7:25 PM3562.5Merge onto I-55 [US-51] (West) for 7.3 mi
7:33 PM3569.8Continue (South) on I-74 [US-51] for 44.8 mi
8:11 PM3614.7At I-74 Exit 179, turn off onto Ramp for 0.2 mi
8:11 PM3614.9Merge onto I-57 (South-West) for 47.4 mi
Construction between Arcola and Tuscola from 11/09/2001 to 06/28/2002
8:53 PM3662.3At I-57 Exit 190, turn off onto Ramp for 0.3 mi
8:53 PM3662.6Merge onto SR-16 (East) for 7.9 mi
9:02 PM3670.5Turn LEFT (North) onto 4th St for 0.2 mi
9:03 PM3670.7 8   Arrive Charleston
End of day
DAY 8
9:00 AM3670.7Depart Charleston on 4th St (South) for 0.2 mi
9:01 AM3670.9Turn LEFT (East) onto SR-16 [Lincoln Ave] for 27.7 mi
9:02 AM3671.6Refuel before here (last refuel was 230.7 miles ago)
9:31 AM3698.7Turn RIGHT (South) onto SR-1 [S Main St] for 13.0 mi
9:45 AM3711.6Turn off onto Ramp for 0.2 mi
Construction between Dennison and Marshall from 11/05/2001 to 07/26/2002
9:46 AM3711.9Merge onto I-70 (East) for 81.3 mi
Construction between Dennison and Marshall from 11/05/2001 to 07/26/2002
9:53 AM3720.7Entering Indiana
10:56 AM3793.2At I-70 Exit 73A, turn off onto Ramp for 0.5 mi towards I-74 / I-465
10:56 AM3793.7Merge onto I-465 [I-74] (South) for 18.0 mi
11:12 AM3811.7Turn off onto Ramp for 0.6 mi towards I-70 / Columbus Oh.
11:12 AM3812.3Merge onto I-70 (East) for 122.3 mi
12:09 PM3878.9Entering Ohio
12:29 PM3901.3Refuel before here (last refuel was 229.7 miles ago)
1:00 PM3934.6Rest break (15 mins)
1:15 PM3934.6Stay on I-70 (East) for 36.8 mi
Resurfacing between Columbus and West Jefferson from 11/30/2001 to 08/30/2002
1:46 PM3971.4Turn off onto Ramp for 0.4 mi towards I-270 / Cincinnati
1:47 PM3971.8Merge onto I-270 (South) for 20.4 mi
2:04 PM3992.2At I-270 Exit 41-43A-B, turn off onto Ramp for 0.3 mi towards I-70 / US-40 / Main St / Columbus / Wheeling
2:04 PM3992.5Merge onto I-70 (East) for 110.8 mi
Reconstruction between Saint Clairsville and Bridgeport from 11/01/2001 to 07/26/2002
3:40 PM4103.3At I-70 I-470 Exit, turn off onto Ramp for 0.2 mi
3:40 PM4103.5Merge onto I-470 (South) for 10.2 mi
3:46 PM4110.0Entering West Virginia
3:49 PM4113.7At I-470 Exit 4, turn off onto Ramp for 0.1 mi
3:49 PM4113.9Merge onto I-70 (South-East) for 30.3 mi
3:57 PM4123.2Entering Pennsylvania
4:03 PM4129.2Refuel before here (last refuel was 227.9 miles ago)
4:15 PM4144.1Turn off onto Ramp for 0.1 mi towards I-79 / Morgantown
4:15 PM4144.3Merge onto I-79 (South) for 45.1 mi
4:44 PM4178.0Entering West Virginia
4:54 PM4189.4At I-79 Exit 148, turn off onto Ramp for 0.4 mi
4:55 PM4189.8Merge onto I-68 (East) for 28.4 mi
Resurfacing between Morgantown and Brandonvile from 07/02/2001 to 05/03/2002
5:19 PM4218.2Rest break (15 mins)
5:34 PM4218.2At I-68 Exit 29, stay on I-68 (East) for 83.4 mi
5:37 PM4221.4Entering Maryland
6:46 PM4301.6At I-68 Exit 82, turn off onto Ramp for 0.6 mi
6:47 PM4302.2Continue (South) on US-522 for 39.4 mi
6:48 PM4303.1Entering West Virginia
Construction near Cross Junction from 10/10/2001 to 06/14/2002
7:09 PM4322.1Entering Virginia
7:30 PM4341.6Turn RIGHT (South) onto Ramp for 0.2 mi
7:30 PM4341.8Merge onto SR-37 (South-West) for 6.8 mi
7:37 PM4348.5At SR-37 I-81 Exit, turn off onto Ramp for 0.2 mi
7:38 PM4348.8Merge onto I-81 (West) for 9.5 mi
7:46 PM4358.2At I-81 Exit 300, turn off onto Ramp for 0.4 mi
7:46 PM4358.6Merge onto I-66 (East) for 43.9 mi
7:48 PM4361.0Refuel before here (last refuel was 231.8 miles ago)
8:24 PM4402.5At I-66 Exit 44, turn off onto Ramp for 0.5 mi towards VA-234 / Manassas
8:25 PM4403.0Merge onto SR-234 (East) for 4.5 mi
8:30 PM4407.5Turn off onto Ramp for 0.3 mi towards VA-28 / US-17
8:34 PM4410.2 9   Arrive Manassas, VA
End of day
DAY 9
9:00 AM4410.2Depart Manassas, VA
9:04 AM4412.5Turn off onto Ramp for 0.5 mi towards VA-234 / I-66
9:05 AM4413.0Merge onto SR-234 (North-West) for 4.9 mi
9:10 AM4417.9Turn off onto Ramp for 0.5 mi
9:11 AM4418.4Merge onto I-66 (West) for 43.7 mi
9:49 AM4462.1At I-66 Exit 1, turn off onto Ramp for 0.6 mi
9:49 AM4462.6Merge onto I-81 (South-West) for 78.9 mi
10:59 AM4541.6Continue (South-West) on I-64 [I-81] for 29.9 mi
11:24 AM4571.5At I-64 Exit 56, continue (South) on I-81 for 109.8 mi
11:42 AM4591.7Refuel before here (last refuel was 230.7 miles ago)
Construction between Fincastle and Buchanan from 06/05/2001 to 05/10/2002
1:00 PM4681.3Continue (West) on I-77 [I-81] for 0.3 mi
1:00 PM4681.6Rest break (15 mins)
1:15 PM4681.6At I-81 Exit 81, turn off onto Ramp for 0.7 mi
1:16 PM4682.3Merge onto I-77 (South) for 124.3 mi
1:43 PM4714.6Entering North Carolina
Construction in southeast Jonesville from 10/29/2001 to 05/31/2002
3:04 PM4806.6Turn off onto Ramp for 0.6 mi towards I-85 / Spartanburg
3:04 PM4807.2Merge onto I-85 (West) for 67.3 mi
3:17 PM4821.6Refuel before here (last refuel was 229.9 miles ago)
3:37 PM4845.3Entering South Carolina
4:02 PM4874.5Continue (South-West) on I-85 Bus for 7.9 mi
4:09 PM4882.5Continue (West) on I-85 for 33.6 mi
4:41 PM4916.0At I-85 Exit 35, turn off onto Ramp for 0.2 mi
4:41 PM4916.2Merge onto SR-86 (West) for 4.8 mi
4:51 PM4921.2 10   Arrive Easley, SC
End of day
DAY 10
9:00 AM4921.2Depart Easley, SC
9:01 AM4921.4Turn LEFT (South-East) onto SR-86 for 4.9 mi
9:09 AM4926.3Turn off onto Ramp for 0.2 mi
9:09 AM4926.4Merge onto I-85 [US-29] (South) for 118.3 mi
Resurfacing near Fairplay from 06/11/2001 to 04/30/2002
9:40 AM4961.8Entering Georgia
10:51 AM5044.8At I-85 Exit 95B, turn off onto Ramp for 1.1 mi towards I-285-BYP / Chattanooga / Birmingham
10:52 AM5045.9Merge onto I-285 [SR-407] (North-West) for 22.2 mi
10:55 AM5048.8Refuel before here (last refuel was 227.1 miles ago)
11:11 AM5068.1At I-285 Exit 10A/B, turn off onto Ramp for 0.3 mi towards I-20 / Tom Murphy Fwy / Birmingham
11:11 AM5068.4Merge onto I-20 [SR-402] (West) for 127.6 mi
11:55 AM5118.6Entering Alabama
1:01 PM5195.9Rest break (15 mins)
1:16 PM5195.9At I-20 Exit 136, turn off onto Ramp for 0.9 mi
1:17 PM5196.9Merge onto I-459 (South) for 29.1 mi
Construction in Hoover from 05/30/2001 to 11/30/2002
1:42 PM5225.9At I-459 I-20 Exit, turn off onto Ramp for 0.4 mi
1:42 PM5226.3Merge onto I-20 [I-59] (South-West) for 224.6 mi
Resurfacing near Foster from 07/09/2001 to 05/24/2002
2:24 PM5274.1Refuel before here (last refuel was 225.3 miles ago)
3:14 PM5332.5Entering Mississippi
5:00 PM5450.9 11   Arrive Clinton, MS
End of day
DAY 11
9:00 AM5450.9Depart Clinton, MS on I-20 (North-West) for 199.0 mi
Construction northwest of Jackson from 09/10/2001 to 08/02/2002
9:31 AM5487.1Entering Louisiana
9:46 AM5503.7Refuel before here (last refuel was 229.6 miles ago)
11:54 AM5649.9At I-20 Exit 26, turn off onto Ramp for 0.4 mi
11:54 AM5650.3Merge onto I-220 (North) for 17.0 mi
12:09 PM5667.3At I-220 Exit 1, turn off onto Ramp for 0.4 mi
12:09 PM5667.7Merge onto I-20 (West) for 60.3 mi
12:19 PM5679.4Entering Texas
Construction in southeast Marshall from 09/10/2001 to 04/19/2002
1:01 PM5728.0Rest break (15 mins)
1:16 PM5728.0At I-20 Exit 587, stay on I-20 (West) for 144.7 mi
1:21 PM5734.2Refuel before here (last refuel was 230.5 miles ago)
3:20 PM5872.7Continue (South) on I-820 [I-20] for 13.7 mi
3:32 PM5886.4Continue (North-West) on I-20 for 122.5 mi towards I-20 / Abilene
4:34 PM5959.5Refuel before here (last refuel was 225.3 miles ago)
5:16 PM6008.9Rest break (15 mins)
5:31 PM6008.9At I-20 Exit 306, stay on I-20 [US-80] (West) for 20.3 mi
5:49 PM6029.2At I-20 Exit 286B, turn off onto Ramp for 65 yds
5:49 PM6029.2Turn LEFT (West) onto W Stamford St [E Overland Trail] for 0.4 mi
5:50 PM6029.6 12   Arrive Abilene, TX
End of day
DAY 12
9:00 AM6029.6Depart Abilene, TX on Grape St (South) for 76 yds
9:00 AM6029.6Turn LEFT (East) onto W Stamford St for 0.5 mi
9:02 AM6030.1Turn LEFT (North) onto Treadway Blvd [SR-243 Spur] for 0.2 mi
9:02 AM6030.3Turn RIGHT (East) onto Ramp for 0.2 mi
9:02 AM6030.5Merge onto I-20 [US-80] (West) for 278.5 mi
11:20 AM6191.8Refuel before here (last refuel was 232.3 miles ago)
1:01 PM6309.0Rest break (15 mins)
1:16 PM6309.0At I-20 Exit 7, stay on I-20 [US-80] (South-West) for 7.4 mi
1:22 PM6316.4Turn off onto Ramp for 0.2 mi
1:22 PM6316.6Merge onto I-10 [US-80] (South-West) for 270.1 mi
2:55 PM6424.1Refuel before here (last refuel was 232.3 miles ago)
4:03 PM6503.5Entering New Mexico
5:15 PM6586.6Turn off onto Ramp for 0.3 mi
5:15 PM6587.0Merge onto SR-549 [W Pine St] (East) for 0.1 mi
5:15 PM6587.1 13   Arrive Deming, NM
End of day
DAY 13
9:00 AM6587.1Depart Deming, NM
9:00 AM6587.2Turn off onto Ramp for 0.4 mi
9:00 AM6587.6Merge onto I-10 [Railroad Blvd] (West) for 273.5 mi
9:59 AM6656.0Refuel before here (last refuel was 231.8 miles ago)
10:10 AM6668.8Entering Arizona
Construction in San Simon from 07/02/2001 to 05/31/2002
12:59 PM6861.1At I-10 Exit 199, turn off onto Ramp for 0.8 mi
1:00 PM6861.9Rest break (15 mins)
1:15 PM6861.9Stay on Ramp (West) for 0.2 mi
1:15 PM6862.1Merge onto I-8 (North-West) for 284.2 mi
1:36 PM6886.0Refuel before here (last refuel was 230.0 miles ago)
Construction near Yuma from 11/23/2001 to 06/28/2002
3:48 PM7040.0Entering California
4:55 PM7118.0Refuel before here (last refuel was 232.0 miles ago)
5:19 PM7146.3Rest break (15 mins)
5:34 PM7146.3At I-8 Ribbonwood Rd Exit, stay on I-8 (West) for 61.4 mi
6:27 PM7207.7Turn off onto Ramp for 0.5 mi towards CA-163 / Downtown
6:28 PM7208.1Merge onto SR-163 [Cabrillo Fwy] (South-East) for 2.9 mi
6:32 PM7211.0Turn off onto Ramp for 142 yds
6:32 PM7211.1Continue (South) on 10th Ave for 0.6 mi
6:35 PM7212.0 14   Arrive San Diego, CA
End of day
DAY 14
9:00 AM7212.0Depart San Diego, CA
9:01 AM7212.4Turn LEFT (North) onto 11th Ave for 0.6 mi
9:02 AM7213.1Continue (North) on Ramp for 0.1 mi towards CA-163 / Escondido
9:03 AM7213.2Merge onto SR-163 [Cabrillo Fwy] (North) for 6.1 mi
9:12 AM7219.2Turn off onto Ramp for 0.6 mi towards I-805 / Los Angeles
9:12 AM7219.8Merge onto I-805 [Inland Fwy] (North-West) for 8.1 mi
9:19 AM7227.9Continue (North) on I-5 [San Diego Fwy] for 62.2 mi
Construction between Dana Point and San Juan Capistrano (NB) from 03/29/2002 to 01/28/2005
10:13 AM7290.1Turn off onto Ramp for 0.5 mi towards I-405 / Long Beach
10:13 AM7290.6Merge onto I-405 [San Diego Fwy] (West) for 73.0 mi
10:49 AM7331.9Refuel before here (last refuel was 214.0 miles ago)
11:16 AM7363.6Turn off onto Ramp for 131 yds
11:16 AM7363.6Merge onto I-5 [Golden State Fwy] (North-West) for 128.9 mi
1:06 PM7492.5Rest break (15 mins)
1:21 PM7492.5At I-5 Twisselman Rd Exit, stay on I-5 [Golden State Hwy] (North) for 115.5 mi
2:18 PM7558.4Refuel before here (last refuel was 226.4 miles ago)
3:00 PM7608.0Bear LEFT (West) onto SR-152 for 40.5 mi
3:45 PM7648.6Turn off onto Ramp for 0.3 mi towards US-101 / CA-152 / San Jose
3:45 PM7648.8Continue (North) on US-101 [SR-152] for 28.1 mi
4:19 PM7676.9Bear RIGHT (North) onto Ramp for 1.2 mi towards I-280 / I-680 / Downtown San Jose / Sacramento
4:20 PM7678.1Merge onto I-680 [Sinclair Fwy] (North-East) for 7.8 mi
4:29 PM7685.9Turn off onto Ramp for 0.3 mi towards Jacklin Road
4:36 PM7687.6 15   Arrive Milpitas, CA